BioGas in action.
Latrine walls being constructed. The inner wall is for the funnel to get the waste into the dome.
See entry for waste. The pipe extends out of the walls for maintenance and cloggage removal. The pipe won't stay that long.
Funnel form work being constructed.
Site layout. 3 latrines, the expansion chamber being worked on and in the back the soak pit for excess liquid being dug.
Expansion Chamber slab has been cast. Featuring 2 manhole covers.
And then well worked on the dome lid. Still a work in progress.
More funnel construction.
Work on the soak pit.
The first funnel. Hope it makes a good poop slide.
Yeah!